GTZ مراسلات مع (ص 145)

غرض

عنوان
GTZ مراسلات مع (ص 145)
المحتوى
Project Monitoring-Schedule
«
c
C9 <
Sewerage Project Al Bireh 95 67 058 Palestinian Territories Wso
aProject BNZ-NI. QCountry Project Officer
ajestiv t
Annex 1/2
|
Overall objective
- Protection of regional water resources
- Reduction of health risks of the population in the
Project Region
4. Opcration personncl trained and qualified
5. Coverage of at Icast operation cost
6. Regulations for inflow are observed
7. Emptying of cess pits is carried out on schedule and
according to demand, sludge is transported to the
treatment plant
~~ %. Wastewater and sludge regulations are observed
. Personnel meets qualification requirements
. Tariff system and collection ratio cnsure solvency
. No discharges of harmful substances to the sewer
metwork
No overflow of cess pits, no uncontrolled discharge
of sludge tankers
. No imgation of restricted crops, no uncentrolled
disposal of sludge
Project Goal Municipality:
‘Wrastcwater disposal in Al Birch environmentally sound {- Treatment plant cffluent with less than 20 mg BODS, | Operation logbook Evaluation of indicators
and safe for people's health 36 mg SSA and 1000 FC/100 mi in an anmual report
- Onaverage > 7.500 m3 wastewater are treated and Operation logbook {from start of opcration
conveyed from the natural catchment area Wadi El until final project
Ein to the neighbouring Wadi Abu el Feed evaluation)
-__85 % connection rate 2 years aftcr start of opcration | Enginecnng department
Assumptions for the Project Goal Municipality:
1. Wastewater treatment capacity is properly used, 1. No switch-offs due to moncy shortage or operating 1. Operation logbook
ixrcatment plant is properly operated errors
2. Wastewaicr quantitics develop according to prediction |2. Population growth rate < 3,5% p.a., domestic water {| 2. Engincering department
consumption < 102 lcd, infiltration < 0,05 V/s/ha
3. Extension of the scwer network by the municipality of |3. Areas with > 150 E/na in Al Birch are connected tao | 3. Enginecring department
Al Birch according to demand the central sewerage system
1-8.
4. Engincering department,
GIZ
5. Accounting, tariff
statutes, GTZ
6. Effluent monitoring
7. Operation logbook
8. Operation logbook
Evaluation of mdicators
in an annual report
(from start of operation
until final project
evaluation) =
BTV Lad May
223 "aN
wn
=
wo
a
rm
=<
هو جزء من
GTZ مراسلات مع
تاريخ
1995-06-26

Contribute

A template with fields is required to edit this resource. Ask the administrator for more information.

Not viewed