GTZ مراسلات مع (ص 146)
غرض
- عنوان
- GTZ مراسلات مع (ص 146)
- المحتوى
-
e
@ -@ e
Results Consultant:
1. Capacities for the necessary wastewater treatment are |1. Capacity 3.000 kg BOD5/d, max. dry weather 1. Acceptance report
established and in operation cfiluent 7.500 m?/d 1.-2.:
t Final report of Consultant
> Wastewater is conveyed from the catchment areacf |2. Conveyance capacity 100 /s 2. Acceptance report
Wadi Quilt to the Wadi Abu cl Feed
Assumptions for the achievement of the results Municipality/Consult.:
1. Civil Admmnistration adheres to planning and 1. Handing-over of final design and supply of pipes Engineering department, Quarterly reports of
supplying promises Consultant Municipality+Consultant
2. Exemmticn from import dutics according to Jsracli- 2. Imports are exempted from import duties and Engineering department, Quarterly reports of
Palcstmian agreements are realized carried out on schedule Consultant Municipality+ Consultant
|
13.1 Support of the municipality's role as implementation |3.1 Implementation according to time scheduic Engincering department, Quarterly reports of
agency tekes place as agreed upon with GTZ Consultant ; Municipality+Consultant
3.2 Qualificatica of the economic operation skills takes
32 A tanff system depending on individual water
place as agreed upon with GTZ
consumption is enforced, collection is carried out
via JWU
(Specific Stipulation (a) and (b) of the Separate
Agreement)
33 Quaiification of the technical opcration skills takes
place zs agreed upon with GTZ i
3.3 a) Personnel available and qualified
(Specific Stipulation (c) and (d) of the
Separate Agreement)
and Inflow Control System developed
(Speciftc Stipulation (e) of the Separate
i Agreement)
(acc. to Stipulation {a})
Passed Tariff statutes
{acc. to Stipulation (6))
Engimecring department
b) sewerage regulation is enforced and Operation | Engincering department
Proposal for a tariff system | Tariff Report before
‘ main contract (WWTP)
Confirming letter before
start of operation, copy
of statutes
Quarterly reports of
| Municipality, confirming
‘letter six month before
| start of operation
Quarterly rcports of
Municipality, confirming
letter before start of
operation