AL-BIREH WASTEWATER TREATMENT PLANT
GENERAL
present the wastewater from the area of Al-Bireh flows to Wadi -1ع
Fin and through it to Wadi Kilt and the Jordan River. The old existing
reatment plant in Wadi El-Ein has been abanded for the last two
decades.
In Wadi El-Ein - as the name indicates - there are many springs
xtant. In order to minimize the possibility of groundwater —
ontamination, the quality of the effluent must be of high standard
and should be disinfected. iii
The location of the existing plant is not adequate anymore because it
proximity to the residential area. f
The new site chosen for the construction of a new عن is 1.5 Km down
area the wadi (see attached map). 5
71
2. PHASES OF CONSTRUCTION
10 treatment plant will be erected in phases, according to the
expected loads and populations served during the design period. Two
phases that were studied are: the first phase which will serve an
expected sewered population of 20 000, anda second phase, at the نهد لمع
of the design period, which will serve a population of 35 ١
The second phase may be further subdivided into intermedia
according to the actual growth of sewered population.
The estimate for th
pop وك based مه
rate of devel Opa