G.T.Z (ص 15)

غرض

عنوان
G.T.Z (ص 15)
المحتوى
08.11.92
0
1 years fate:
Israeli occupied territories Page:
[nportant assunptions
Project Title Al-Bireh sevage recycling project Duration of project
Project Number 87,3564.9-01.100 Country
Jonjectivety verifiable indicators (0VI's) Jems /sources of verification
Inputs/costs specifcation
+ Land for treataent plant
+ [nfrastracture to reach location of the treatuent plant
* Bagineering and consulting expenses
+ Vehicles (2-3)
+ Equipaent (!)
+ Lab facilities
+ Personnel
> project aanager
+ for supervision and construction (3 - 4)
- for operating unit (5 - §)
> extension staff (4)
- Local exptertise
+ Experiaental and denonstration fara} Up to $ 600.000 but oniy for
* Hydraulic infrastructure for irrigation! irrigation
111. Geraan contribution
+ Personnel
- 1 long-tera advisor up to 24
- Short-term advisors up to 13
+ Pilot schene 1
+ Design 1
. Construction (2,4) 4
. Laboratory 1
. Feasibility study 45
+ Funds for training (to be specified)
+ Constraction costs treataent pleat (civil vorts): Up to § Mio DM
+ Equipment for the treataent plant (electroaech. | to be verified
incl. spere parts) 0
+ Laboratory ‏ل‎
+ Maintenance equipaent + operation
# Vehicles)
+ Constraction equipaeat pilot scheae
هو جزء من
G.T.Z
تاريخ
1980

Contribute

A template with fields is required to edit this resource. Ask the administrator for more information.

Not viewed