G.T.Z (ص 124)
غرض
- عنوان
- G.T.Z (ص 124)
- المحتوى
-
b) second short-term experts for a total period of up to 10 person-months, covering the
fields of:
: trial plant
5 planning a sewage treatment plant
: installation of electromechanical equipment
- laboratory
5 a concept for waste water.and sludge utilisation
The results of the short-term experts will be submitted to the MAB in the form of
appraisal reports and short reports depending on the relevant field of activity.
The short-term experts shall perform their duties along with the counterpart
specialists.
0 assume the following costs thereby
- remuneration of the seconded experts
3 accommodation for the seconded experts
- outward and homeward travel of the seconded experts
3 Official journeys of the seconded experts within the Israeli occupied territories
and outside the territories
Supplies of materials and equipment
The GTZ shall
a) supply
5 materials for construction of a trial plant
- a project vehicle ”
- the equipment for a sewage laboratory
- expendables ,
b) assume the costs of transporting and insuring the materials and items of equipment
listed in a) (supra) to the project location. It shall not, however, assume port dues,
import and export duties and other official charges, or warehouse charges and the
costs of storage during customs clearance.
0 undertake the processing of warranty claims, insurance claims, and procurement of
replacement items.
The materials and items of equipment supplied shall become the property of the Municipality
of Al-Bireh on their arrival in Al-Bireh.
The project vehicle shall be at the unrestricted disposal of the long-term expert pursuant to
section 3 (1) a) in the performance of his duties.
The material and the items of equipment shall be supplied at the times specified in a plan of
operations to be drawn up jointly with the MAB.
Basic and further training outside the project
The GTZ shall assume the costs of local MAB specialists attending training courses in the
field of “operating a sewage plant” in the West Bank and outside the West Bank, depending
on the options available and the actual requirements, up to a maximum amount of
DM 117,000 (in words: one hundred and seventeen thousand Deutsche Mark).
Financial contribution
١ Seanned with :
١ لكا CamScanner’:
STN
@)
(3)
(4) - هو جزء من
- G.T.Z
- تاريخ
- 1980
Contribute
Not viewed