Treatment of Wastewater Al Bireh_ PPR February 2000
\ AIDE-MEMOIRE
Mission of Project Progress Review
TREATMENT OF WASTEWATER AL BIREH
1. PREFACE
The purpose of the Project Progress Review (PPR) was to analyse the actual
progress of the project on the basis of the original pianning and to determine the
contributions achieved and the development impacts, originated by the project and
other factors. The mission took place at Al Bireh, Palestine, from February 2 to
February 16, 2000. During the days February 12 to 14 a planning workshop, ZOPP 5,
was conducted with all involved. actors, defining the contents of a 6 months نبت
prolongation of the actual phase till December 31, 2000. Planning for a 5
complementary phase 2 of Technical Cooperation for a duration of 1,5 years
(01.01.01 to 30.06.02) was also described. The objective was to conclude the
Technical Cooperation component of the project in the utmost successfull way.
The participants of the PPR were the following professionals:
Uwe Putzar Technical evaluator and Team Leader
Andreas Kanzler 2 Technical Department GTZ HQ (as from 09.02. to 16.02.00)
Mr. Adnan Ghosheh, GTZ-Advisor for the Projects of Al Bireh and Salfeet, acted as
resource person and mission assistant. The ZOPP 5-Workshop was moderated by
Mr. Nadim Mulhem.
2. PROJECT HISTORY AND CONCEPT
The Technical Cooperation between the Municipality of Al Bireh and GTZ was عت
initiated in 1992. The implementation agreement was signed in June 1993. The ;
purpose of this project is to enable the Municipality of Al Bireh to operate the
sewerage system including the wastewater treatment plant according to the technical
and economical requirements, and to elaborate and indroduce an agreed concept for
the reuse of the treated wastewater and sludge in the agriculture. Due to the
condition to avoid any contamination to the natural recipient Wadi Qilt, of which the
catchment area is intensively used for drinking water purposes, it had to be planned
to transfer the effluents of the wastewater treatment plant to the adjacent Dier
Dibwan area, where it could be used for irrigation and fertilizing purposes in the
agricultural activities of Palestinian landowners and farmers.
The concept of the project included the extension and completion of the sewerage
system of Al Bireh and the construction of a modem biological wastewater treatment
plant including effluent pipes and storage tank for the reuse of the treated
wastewater. As a main target of the Technical Cooperation it included also to buildup
a qualified institutional structure within the Municipality of Al Bireh for an adequate
_ operation and maintenance of the sewer network and wastewater treatment plant
through training of the required operational personnel. |: