A201 of Wastewater AlBireh _PER February 2000
ae os meena einwiee saben cise Sew aes eee Bh san Taha inetaan oe oa ne
.. The ‘improved sanitary infrastructure is a good basis for a more active
development of the town (building industry) and will attract more entrepreneurial
activities in the near future.
As negative impacts it might ‘be’ stated, that for the time being the Municipality
continus depending on the external contribution to the project and has not yet
achieved a-cost recovery for the operational and depreciation costs for the actual
sewerage system in operation.
4. RECOMMENDATIONS
4.1 Summary
On the basis of the results of the Project Progress Review, the mission recommends
to continue with the Technical Cooperation project for a period of two years,
considering a 6 months-prolongation of the actual phase till December 31, 2000 .
followed by a complementary phase 2 of 1,5 years from January 1*, 2001 to June
30", 2002. This period of 2 years shall serve mainly to assist the Sewage Section in . @
all operation matters of the wastewater treatment plant with the objective to train the
operational staff permanently on the job to ensure a constant quality of the effluents
and sludge characteristics, and to assist the Municipality in economical matters and
public awareness campaigns.
4.2 Planning Workshop
From this point of view it was organized from February 12 to 14 a ZOPP 5-Workshop
at the Municipality of Al Bireh for the planning of an additional project period, during
which the project objective as well as the results to be achieved, the indicators, the
assumptions and the corresponding activities were redefined. It was decided to
maintain the overall goal without any modification as follows:
Overall Goal: Securing an environmentally sound sanitation
4.3. Project Objective and Results
Project Objective: The sewerage system of Al Bireh is operated effectively
according to the established standards and regulations: |
Result 1: The technical and administrative staff are operating and
maintaining the sewerage system on a reliable basis.
Result 2: The economic viability is ensured.
Result 3: Awareness of the public and self-image are enhanced.
4.4 Important Indicators
The most important indicators were identified and agreed, which permits to the
executing institutions having a tool to control the achievement of the project objective
and the different results.