G.T.Z (ص 142)
غرض
- عنوان
- G.T.Z (ص 142)
- المحتوى
-
1 im ؟ل“«ءؤ٠+غ٠“"”ن”»سمس1!3:ه4
7 PPR February 0
Indicators for Project Objective:
' Project Objective: 1. The effluent quality meets the 20/30 regulation by the
end of the 2™ year of operation of the WWTP.
2. 80% of connectees are billed by MAB within the 1* year.
Indicators for Results:
Result 1: - Response time for repair of sewerage system is less
, than 12 hours.
5 — 40% of licensed trucks use septic facilities in WWTP for
a fee within 1° year of operation of WWTP.
— Number of over-flowing manholes is reduced by 20% at
the end of 2™ phase.
Result 2: - Full operation and 50% of depreciation cost are
recovered at the end of 2™ phase. 9
6 Result 3: - No. of forced connections is reduced by 50%.
~— Reducing of connection of roof draining to sewerage
network by 30% of current cases by end of 2™ phase.
- 70% of bills are paid on time.
— JWU fee collection ratio is not negatively effected.
4.3 Recommendations regarding the Contribution of GTZ
With the purpose to achieve the results in the within the agreed timetable of 2 years,
the mission recommends the following assignments of experts, which still have to be
planned in detail and quantified:
Long term assignment: Technical Advisor / Expert in operation of wastewater and
sludge treatment plants as well as sewer networks.
Short term assignments: External and local advisory services for support of 6
Dp commercial department and_ public awareness
campaigns.
The outcome of the ZOPP 5-Workshop as well as the recommendations made by the
PPR-Team are subject to an official approval by the German Ministry for Economical
Cooperation and Development (BMZ).
١ Seanned with :
١ لكا CamScanner’: - هو جزء من
- G.T.Z