‘ Technische Zusammenart
3.2. PPR Time Frame sen ok
llowin A
iS cr ام iy is designed to give you an idea of the time
ge of the PPR work process if conducted professionally. The
times given are meant as a rou h lu 1 i
enon cumstances gh guide only; actual time requirements will vary depend-
si qeorWor Kz ee ;
Study and evaluation of 2 documents E 3
Assignment briefing 2 1
Introductory talks.with: va
project manager/principal advisor 1
GTZ office 0.5
partner organization 1
German embassy 0.5
Hand-over/elucidation of project documentation 1
®@ Presentation/discussion of implementation status (compari- 2-3 1
son of actual situation with targets)
Talks with relevant organizations in the partner country 2-3
Trips to project area and neighboring countries; talks with 3-7
target groups
Environmental impact assessment 1
Internal review of project documents 2-3
Individual talks with project management and the GTZ team 1-3
Presentation and discussion of PPR results 1-2
Discussion of PPR results in project team 1-2
Documentation of results, duplication and distribution 1-3
Final talks with the project manager, the principal advisor 1
and, if necessary, the director of the GTZ office and signing
of a joint record
Final visit to the German embassy 0.5
5
Writing of various sections of PPR report (preliminary ver-
(highly variable!)
sion)
ae Integration of the individual sections and overall editing of 3-5
the PPR report
Evaluation talk 1
Completion of project impact assessment form (GTZ form 0,5
23-19-e)
GTZ, Internal Evaluation, January 1999